You are here:

Lost Circulation Model

During drilling or cementing operations, drilling fluid or cement slurries may be lost into the permeable or cavernous formations. This is called lost circulation. Treatment of lost circulation has become an important aspect of a successfully constructing a well. Pumping in lost circulation treatment material (LCM) while controlling bottom hole pressure and temperature requires a complete understanding of the hydraulic and thermal conditions in the wellbore.

The software has been developed to assist in the design of drilling, cementing, or well treatment operations where lost circulation is present. The simulator models the fluid displacement process with a planned pumping schedule, different loss conditions, and any annular filling operations.

During drilling or cementing operations, drilling fluid or cement slurries may be lost into the permeable or cavernous formations. This is called lost circulation. Treatment of lost circulation has become an important aspect of a successfully constructing a well. Pumping in lost circulation treatment material (LCM) while controlling bottom hole pressure and temperature requires a complete understanding of the hydraulic and thermal conditions in the wellbore.

The software also has been developed to assist in the design of drilling, cementing, or well treatment operations where lost circulation is present. The simulator models the fluid displacement process with a planned pumping schedule, different loss conditions, and any annular filling operations.

Features

  • Land and offshore well
  • Options to specify or calculate loss rate Multiple annulus fill situations
  • Lost volume vs. time
  • Free-fall/back-fill (U-tubing) calculation ECDs/pressures at various depths vs. time
  • Handling of up to 12 fluids, each at up to 40 different rates Fluid displacement animation
  • Shut-in time Caliper log import
  • Bingham Plastic, Power Law, and Herschel Buckley rheology models
  • Temperature at point of interest
  • Pressure drop calculation for coiled tubing Microsoft Word report

LCPRO-2D Displacement Simulation

LCPRO-Handles up to 12 Fluids

LCPRO-Volume Loss vs. Elapsed Time

Clean Max

Advanced Wellbore Cleanup Model

A successful wellbore cleanup is one of the most critical steps to ensure a trouble-free completion. Cleanup operations reduce the risk of formation damage and enhance well productivity by efficiently and meticulously planning out the removal of leftover drilling fluid residue and casing debris. In addition to spacer chemistry and cleanup tools, advanced displacement software has contributed to creating a more competent displacement process leading to lower operation costs and increased production.

Features

  • Up to 16 operation stages for land wells
  • Combination of 9 flow paths for deep water operations Free-fall/back-fill (U-tubing) calculation ECDs/pressures at various depths vs. time
  • Up to 12 fluids for each stage Circulating temperature prediction Fluid compressibility
  • Pressure and temperature dependent rheology Effects of pipe standoff on hydraulics Circulation sub and gravel pack
  • Coiled tubing operation
  • Flow split with 2 circulation subs

CleanMax Plus-ECD vs. Elapsed Time

Clean Max Plus-Output Summary

Stuck pipe analysis model

Stuck pipe occurrences are widely held to be the most expensive drilling problem confronting the petroleum industry and the cost of correcting, even a single occurrence, can amount to millions of dollars. Stuck Pipe Pro, developed by PVI and Chevron, calculates differential sticking force, stuck chance along drill strings or casings for pick up operation.

Features:

  • 3D wellbore
  • Multiple wellbore, pipe and formation sections
  • Axial drag and side force calculations
  • Differential sticking
  • Additional side force due to pipe stiffness
  • Friction factors for different wellbore intervals
  • Friction factors for each pipe
  • Extensive tubular database included
  • MS Word report
  • US oil field, SI and customized units
  • 3D visualization of any user-defined parameter

Stuck Pipe Pro Axial Drag for Pick Up and Tension Limit

Stuck Pipe Pro-Chance of Getting Stuck

Stuck Pipe Pro Contact Area Visualization

Stuck Pipe Pro Free Point and Black off Calculation

Our Values EXCITES

EXCellence

Innovation

Integrity

TEamwork

Safety